Boltons Place: a private new build project comprising three houses, which was subject to significant delays and cost increases caused by a combination [...]
Ebury Square Belgravia
Ken Richman2017-05-31T21:22:12+01:00The partitions/ceiling subcontractor encountered delays due to main contractor changes and slow completion by preceding trades. The services provided included producing time and [...]
Former Harrods Depository Building, Trevor Square
Ken Richman2017-05-26T16:43:39+01:00An issue arose concerning the degree to which the design and build contractor was required to refurbish secondary structural elements of the works. [...]
Space One Building, Hammersmith
Ken Richman2017-05-26T16:42:23+01:00Issues arose where the main contractor commenced a series of adjudications whenever it considered its interim applications for time and money had been [...]
Park Lane Hotel
Ken Richman2017-06-05T14:07:22+01:00Several delays occurred to the works causing the sectional completion dates to be exceeded. A critical path delay analysis and explanatory narrative were [...]
Battersea Power Station Phase One
Ken Richman2017-06-05T14:10:34+01:00Delays occurred to the substructure works of Phase One caused by the piling works and design changes. An interim report on causes of [...]
Pauline House Whitechapel
Ken Richman2017-05-26T16:38:04+01:00Final account differences occurred between the local authority employer and the contractor concerning additional work the contactor alleged had been carried out in [...]
Dorset House refurbishment of mechanical services
Ken Richman2017-06-05T15:14:08+01:00A main contractor installed new gas, water, sewerage and central heating systems into a 200-unit listed and partly occupied private residential block. Although [...]
St Pancras Hotel refurbishment
Ken Richman2017-06-05T14:11:29+01:00Procurement advice was given to the employer during the two-stage tender process. The employer was provided with monthly and, on occasion, weekly project [...]
Oakfield Close New Malden
Ken Richman2017-06-05T14:12:00+01:00Advice was given to the local authority employer regarding the variations to and the standard of construction of the as built works.