An issue arose concerning the degree to which the design and build contractor was required to refurbish secondary structural elements of the works. [...]
Park Lane Hotel
Ken Richman2017-06-05T14:07:22+01:00Several delays occurred to the works causing the sectional completion dates to be exceeded. A critical path delay analysis and explanatory narrative were [...]
Pauline House Whitechapel
Ken Richman2017-05-26T16:38:04+01:00Final account differences occurred between the local authority employer and the contractor concerning additional work the contactor alleged had been carried out in [...]
Dorset House refurbishment of mechanical services
Ken Richman2017-06-05T15:14:08+01:00A main contractor installed new gas, water, sewerage and central heating systems into a 200-unit listed and partly occupied private residential block. Although [...]
St Pancras Hotel refurbishment
Ken Richman2017-06-05T14:11:29+01:00Procurement advice was given to the employer during the two-stage tender process. The employer was provided with monthly and, on occasion, weekly project [...]
Crystal Palace Park hard landscaping works
Ken Richman2017-06-05T14:11:51+01:00These works, which included the refurbishment of the Victorian dinosaur collection were suffering from delay and quality issues. These issues were resolved by [...]
Oakfield Close New Malden
Ken Richman2017-06-05T14:12:00+01:00Advice was given to the local authority employer regarding the variations to and the standard of construction of the as built works.